Availability: | |
---|---|
Quantity: | |
Basic Info.
A scaffold system is a temporary structure used to support workers and materials during the construction, repair, or maintenance of buildings and other structures. Scaffold systems typically consist of a series of interconnected horizontal and vertical components that are assembled on site to provide a stable platform for workers to perform their tasks.
Ringlock | Material | Surface treatment | Dimensions |
60 system standard | Q355 | Hot dipped galvanized | φ60*3.25mm |
Q355 | Hot dipped galvanized | φ48.3*3.25mm | |
Ringlock ledger/horizontal | Q235 | Hot dipped galvanized | φ48.3 2 * .3 5 .2 m /3 m /2.75/ |
Ringlock diagonal brace /Bay braces | Q235 or Q195 | Hot dipped galvanized | φ48.3*2.75 |
Double /Truss /bridge /Reinforce ledger | Q235 or Q195 | Hot dipped galvanized | φ48.3*2.75 mm |
Intermediate Transom | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Trussed Beam/Lattice Girder | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Side bracket /board bracket | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Base collar | Q235,Q345 | Hot dipped galvanized | φ48.3*3mm, φ57*3.5mm, φ70*3.5mm |
Ringlock accessories | Ringlock rosette、Ringlock ledger head、Ringlockbrace end、 Ringlockpins、Twin Wedge Coupler、Spigot、scaffold rack、 scaffold basket |
detalis:
Standard With Spigot
Item No. | Length | Theoretic Weight |
ST-RS48-500 | 0.5m/1'7" | 3.2 kg/7.04 Ibs |
ST-RS48-1000 | 1.0m/3'3" | 5.5 kg/12.1 Ibs |
ST-RS48-1500 | 1.5m/4'11" | 7.8 kg/17.16 Ibs |
ST-RS48-2000 | 2.0m/16'6" | 10.1 kg/22.22 Ibs |
ST-RS48-2500 | 2.5 m/8'2" | 12.4 kg/27.28 Ibs |
ST-RS48-3000 | 3.0m/9'9" | 14.6 kg/32.12 Ibs |
Ringlock ledger/horizontal
Item No. | Length |
ST-RL48-390 | 0.39 m/1'3" |
ST-RL48-500 | 0.50 m/1'7" |
ST-RL48-732 | 0.732 m/2'5" |
ST-RL48-1088 | 1.088 m/3'7" |
ST-RL48-1286 | 1.286 m/4'3" |
ST-RL48-1400 | 1.40 m/4'7" |
ST-RL48-1572 | 1.572 m/5'2" |
ST-RL48-2072 | 2.072 m/6'9" |
ST-RL48-2572 | 2.572 m/8'5" |
ST-RL48-3070 | 3.07 m/10'4" |
Reinforce ledger
Lattice Girder
board bracket
Base collar
The main components of a scaffold system include:
Standards: Vertical tubes or pipes that provide the main structural support for the scaffold. They are usually placed at regular intervals along the length of the scaffold.
Ledgers: Horizontal tubes that connect the standards together, providing additional support and stability to the scaffold structure.
Transoms: Horizontal tubes that are placed perpendicular to the ledgers, providing support for the scaffold boards or platforms.
Scaffold boards or platforms: These are the working surfaces where workers stand or place materials. They are typically made of wood, metal, or other suitable materials.
Braces: Diagonal tubes that connect the standards and ledgers, adding rigidity and stability to the scaffold structure.
Base plates and adjustable jacks: These components are used to provide a stable foundation for the scaffold on the ground. Base plates distribute the weight of the scaffold, while adjustable jacks allow for leveling on uneven surfaces.
Guardrails and toe boards: These safety features are installed along the edges of the scaffold platform to prevent falls and provide protection for workers.
Application
Construction Industry
The Ringlock scaffolding system is extensively utilized in the construction industry. It serves as a crucial support structure for workers during the building process. This system is particularly beneficial for constructing high-rise buildings and bridges, where stability and safety are paramount. Its modular design allows for easy assembly and disassembly, making it adaptable to various architectural shapes and heights. Additionally, it is employed in the construction of industrial factories, providing a stable platform for workers to perform tasks efficiently.
Maintenance and Renovation Projects
In maintenance and renovation projects, the Ringlock scaffolding system proves to be invaluable. It is commonly used for repairing and maintaining older buildings. The system's flexibility enables it to fit into tight spaces around buildings, facilitating tasks such as cleaning exteriors, repairing windows, and repainting surfaces. By providing a secure working platform, it ensures that maintenance personnel can complete their work safely and effectively.
Event Setup and Temporary Structures
Beyond permanent construction, the Ringlock scaffolding system is also widely used for setting up temporary structures for events. It can be quickly assembled to create stages, viewing platforms, and other temporary facilities required for concerts, exhibitions, and festivals. Its durability and ease of installation make it a preferred choice for event organizers who need reliable and versatile solutions.
FAQ
Q:How do you ensure my goods? |
A:First our clients can visit factory to see the raw material, production lines, warehouse, transportation and inspection workshop.And you can ask for free sample, we can also process goods as your special requirements. Please do not hesitate to contact us. |
Q: How is your delivery time? |
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule. |
Q: Could you provide sample? |
A: Yes,we can provide sample together with our catalogue. But the courier charge will on your side. We'll send back the courier charge if you make an order. |
Q:Whats the payment term? |
A: We usually use the T/T,L/C,Western union. |
Basic Info.
A scaffold system is a temporary structure used to support workers and materials during the construction, repair, or maintenance of buildings and other structures. Scaffold systems typically consist of a series of interconnected horizontal and vertical components that are assembled on site to provide a stable platform for workers to perform their tasks.
Ringlock | Material | Surface treatment | Dimensions |
60 system standard | Q355 | Hot dipped galvanized | φ60*3.25mm |
Q355 | Hot dipped galvanized | φ48.3*3.25mm | |
Ringlock ledger/horizontal | Q235 | Hot dipped galvanized | φ48.3 2 * .3 5 .2 m /3 m /2.75/ |
Ringlock diagonal brace /Bay braces | Q235 or Q195 | Hot dipped galvanized | φ48.3*2.75 |
Double /Truss /bridge /Reinforce ledger | Q235 or Q195 | Hot dipped galvanized | φ48.3*2.75 mm |
Intermediate Transom | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Trussed Beam/Lattice Girder | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Side bracket /board bracket | Q235 | Hot dipped galvanized | φ48.3*3 mm |
Base collar | Q235,Q345 | Hot dipped galvanized | φ48.3*3mm, φ57*3.5mm, φ70*3.5mm |
Ringlock accessories | Ringlock rosette、Ringlock ledger head、Ringlockbrace end、 Ringlockpins、Twin Wedge Coupler、Spigot、scaffold rack、 scaffold basket |
detalis:
Standard With Spigot
Item No. | Length | Theoretic Weight |
ST-RS48-500 | 0.5m/1'7" | 3.2 kg/7.04 Ibs |
ST-RS48-1000 | 1.0m/3'3" | 5.5 kg/12.1 Ibs |
ST-RS48-1500 | 1.5m/4'11" | 7.8 kg/17.16 Ibs |
ST-RS48-2000 | 2.0m/16'6" | 10.1 kg/22.22 Ibs |
ST-RS48-2500 | 2.5 m/8'2" | 12.4 kg/27.28 Ibs |
ST-RS48-3000 | 3.0m/9'9" | 14.6 kg/32.12 Ibs |
Ringlock ledger/horizontal
Item No. | Length |
ST-RL48-390 | 0.39 m/1'3" |
ST-RL48-500 | 0.50 m/1'7" |
ST-RL48-732 | 0.732 m/2'5" |
ST-RL48-1088 | 1.088 m/3'7" |
ST-RL48-1286 | 1.286 m/4'3" |
ST-RL48-1400 | 1.40 m/4'7" |
ST-RL48-1572 | 1.572 m/5'2" |
ST-RL48-2072 | 2.072 m/6'9" |
ST-RL48-2572 | 2.572 m/8'5" |
ST-RL48-3070 | 3.07 m/10'4" |
Reinforce ledger
Lattice Girder
board bracket
Base collar
The main components of a scaffold system include:
Standards: Vertical tubes or pipes that provide the main structural support for the scaffold. They are usually placed at regular intervals along the length of the scaffold.
Ledgers: Horizontal tubes that connect the standards together, providing additional support and stability to the scaffold structure.
Transoms: Horizontal tubes that are placed perpendicular to the ledgers, providing support for the scaffold boards or platforms.
Scaffold boards or platforms: These are the working surfaces where workers stand or place materials. They are typically made of wood, metal, or other suitable materials.
Braces: Diagonal tubes that connect the standards and ledgers, adding rigidity and stability to the scaffold structure.
Base plates and adjustable jacks: These components are used to provide a stable foundation for the scaffold on the ground. Base plates distribute the weight of the scaffold, while adjustable jacks allow for leveling on uneven surfaces.
Guardrails and toe boards: These safety features are installed along the edges of the scaffold platform to prevent falls and provide protection for workers.
Application
Construction Industry
The Ringlock scaffolding system is extensively utilized in the construction industry. It serves as a crucial support structure for workers during the building process. This system is particularly beneficial for constructing high-rise buildings and bridges, where stability and safety are paramount. Its modular design allows for easy assembly and disassembly, making it adaptable to various architectural shapes and heights. Additionally, it is employed in the construction of industrial factories, providing a stable platform for workers to perform tasks efficiently.
Maintenance and Renovation Projects
In maintenance and renovation projects, the Ringlock scaffolding system proves to be invaluable. It is commonly used for repairing and maintaining older buildings. The system's flexibility enables it to fit into tight spaces around buildings, facilitating tasks such as cleaning exteriors, repairing windows, and repainting surfaces. By providing a secure working platform, it ensures that maintenance personnel can complete their work safely and effectively.
Event Setup and Temporary Structures
Beyond permanent construction, the Ringlock scaffolding system is also widely used for setting up temporary structures for events. It can be quickly assembled to create stages, viewing platforms, and other temporary facilities required for concerts, exhibitions, and festivals. Its durability and ease of installation make it a preferred choice for event organizers who need reliable and versatile solutions.
FAQ
Q:How do you ensure my goods? |
A:First our clients can visit factory to see the raw material, production lines, warehouse, transportation and inspection workshop.And you can ask for free sample, we can also process goods as your special requirements. Please do not hesitate to contact us. |
Q: How is your delivery time? |
A: We always prepare enough stock material for your urgent requirement.The delivery time is 7days for all the stock material. We will check with our production department for the non-stock items to offer you the exact delivery time and producing schedule. |
Q: Could you provide sample? |
A: Yes,we can provide sample together with our catalogue. But the courier charge will on your side. We'll send back the courier charge if you make an order. |
Q:Whats the payment term? |
A: We usually use the T/T,L/C,Western union. |